Thursday, 7 November 2013

DT

This week in DT was really productive. We were shown how to drill. A hole at the top of the posts at one time so we could put the bar on top it so the swinging arm could go on it. He also showed us how to glue our side posts onto the base which was really useful. What you had to do was get a electric screwdriver and drill a hole through the bottom piece so a large nail can be drilled in and onto the base so both can be connected. We did it four times on each side which took a while but it was still good and we had not problems with it. Next we started to build the metal bar that goes through the top hole of the posts.

No comments:

Post a Comment